Skip to main content

Exit WCAG Theme

Switch to Non-ADA Website

Accessibility Options

Select Text Sizes

Select Text Color

Website Accessibility Information Close Options
Close Menu
Linkhorst Law Firm Linkhorst Law Firm
  • Schedule a Case Analysis

Who is Responsible for Construction Project Delays?

construction blueprint

Construction delays are common on projects of every size, but determining who is responsible for those delays can be one of the most challenging aspects of construction law. Delays may result from actions by the owner, the contractor, or outside events that neither party controls. When disputes arise, it must be determined who caused the delay and what remedies may be available.

Properly allocating responsibility for delays is important because it affects contract completion dates, entitlement to additional compensation, liquidated damages, and the overall financial outcome of a project.

However, allocating responsibility for construction delays is rarely straightforward. Projects often involve overlapping delays, changing schedules, and multiple parties with competing interests. Determining who caused a delay and whether that delay affected the project’s completion requires careful analysis of contracts, schedules, and project records. By maintaining thorough documentation and understanding how delay claims are evaluated, owners and contractors can better protect their legal rights.

Owner-Caused Delays

Owner-caused delays occur when the project owner’s actions—or failure to act—interfere with the contractor’s work. Common examples include:

  • Late approvals or design decisions
  • Delays in providing access to the job site
  • Changes to the project scope
  • Failure to provide owner-furnished materials
  • Delayed payments
  • Slow responses to requests for information

When owner-caused delays extend the project schedule, contractors may be entitled to additional time and compensation for increased costs. These delays are often referred to as compensable delays.

Contractor-Caused Delays

Contractor-caused delays result from issues within the contractor’s control, such as:

  • Labor shortages
  • Poor project management
  • Scheduling errors
  • Equipment failures
  • Delayed submittals
  • Slow work performance

If a contractor causes a project to finish late, the contractor may be responsible for liquidated damages or other losses specified in the contract.

Excusable Delays

Some delays occur through no fault of either party. These are commonly known as excusable delays and may include:

  • Severe weather
  • Natural disasters
  • Strikes
  • Government actions
  • Unforeseen site conditions

Excusable delays often entitle the contractor to additional time, but not necessarily extra compensation.

Possible Damages

A couple types of damages apply in these cases. If the contractor is solely responsible for late completion, the owner may seek liquidated damages, which are predetermined amounts specified in the contract.

Conversely, contractors may also seek compensation for owner-caused delays, including:

  • Extended overhead
  • Additional labor costs
  • Equipment expenses
  • Escalating material costs
  • Lost productivity

However, contractors generally cannot recover damages for periods during which they were also responsible for project delays. Likewise, owners typically cannot assess liquidated damages during periods of concurrent owner-caused delay.

Why Documentation Matters

Delay claims often depend on the quality of project records. Well-maintained records make it easier to determine responsibility and resolve disputes efficiently. Helpful documentation includes:

  • Daily reports
  • Schedules
  • Emails and correspondence
  • Change orders
  • Meeting minutes
  • Photos
  • Payment records
  • Requests for information (RFIs)

Contact Us Today

Construction delays happen often and they can derail a project. Understanding responsibility can help determine the consequences each party will face.

A strong contract can help with these matters. A Florida construction contract lawyer from Linkhorst Law Firm can provide skilled contract drafting. Contact us before signing your name to any construction contract. Fill out the online form or call 561-626-8880 to schedule a consultation.

Source:

pressbooks.lib.vt.edu/constructioncontracting/chapter/allocating-responsibility-for-delays/

Facebook Twitter LinkedIn

By submitting this form I acknowledge that form submissions via this website do not create an attorney-client relationship, and any information I send is not protected by attorney-client privilege.

Skip footer and go back to main navigation